In manufacturing, every purchase order ties a part number and a delivery date to your production schedule. PurchaseOrders reads each raw material, component, or equipment PO with AI and returns a clean record, PO number, supplier, part numbers, quantities, units of measure, unit prices, and the promised delivery date, in seconds, so the figures can flow into your MRP and inventory planning before a missing part stalls the line. Upload a manufacturing PO below to see the captured data.
Submit your purchase orders
Drop documents here, or click to file
Up to 50 files per batch
Uploading...
Every raw material and component that enters production flows through a purchase order, and each PO carries the part number, quantity, and promised delivery date that your material requirements planning depends on. The problem is that supplier POs and order acknowledgments come in as PDFs, scans, and emailed attachments in dozens of formats, so getting that data into MRP or an inventory sheet means someone retypes each order by hand, line by line.
MRP only works if the promised delivery date for each component is in the system. When a PO sits in an inbox and the date never gets logged, a short-shipped or late part surfaces only when the line is already starved.
A metals supplier sends a tidy PDF, a fastener vendor sends a scanned acknowledgment, an electronics distributor sends a photographed order. Re-keying each layout into MRP is slow, and template tools break on every new format.
A component PO lives or dies on the part number, quantity, and unit of measure. A transposed digit or a sheet-versus-each mix-up drives the wrong order quantity and a BOM that does not reconcile.
A plant issuing 150 or more POs a month spends real hours keying them. When capture is manual, more orders means more data entry, and the cost per PO never falls as you grow.
Material requirements planning uses the bill of materials, current inventory, and the master production schedule to calculate exactly what to order, in what quantity, and by when. That math is only as good as the purchase order data behind it: the part number, quantity, unit of measure, and the supplier's promised delivery date. Automating the capture of PO data is the fastest way to keep MRP current without changing how your suppliers send orders. PurchaseOrders handles the data-capture step; your ERP or MRP system still owns the build schedule and the inventory ledger.
PurchaseOrders reads each raw material, component, or equipment purchase order with AI and returns a clean, structured record you can review and drop into your MRP, ERP, or inventory sheet. It removes the manual reading and re-keying so part numbers and delivery dates land in planning the day the order is placed or acknowledged.
Capture the PO number, supplier, part numbers, descriptions, quantities, units of measure, unit prices, promised delivery dates, and terms from raw material, component, and equipment orders alike.
The AI captures every line of the order, including long multi-page material lists, so each part can be matched to your BOM and item master in MRP.
No templates to build. The same extraction handles a clean distributor PDF, a scanned supplier acknowledgment, and a photographed order ticket.
Export clean Excel or CSV for your planning sheet, or import the data into ERP and MRP software so part numbers and delivery dates are logged without anyone retyping them.
The captured data fits the rest of your manufacturing back office. If you only need the file fast, the pure manufacturing purchase order extractor converts a PO to a spreadsheet directly, and a stack of orders clears in one pass with bulk purchase order processing. Push the data into your system with a purchase order to NetSuite import, a QuickBooks converter, or follow the full ERP import workflow. Because planning depends on the line detail, accurate purchase order line item extraction is what keeps your BOM and order quantities correct, and to roll component spend up across suppliers see how to consolidate supplier spend. Procurement teams in adjacent sectors run the same tool through retail PO extraction and healthcare PO extraction.
Three ways to get part numbers, quantities, and delivery dates off a manufacturing purchase order, compared on what matters on the floor.
| What matters in production | Re-key by hand | ERP / MRP suite | PurchaseOrders AI |
|---|---|---|---|
| Time to capture one PO | Several minutes each | Manual entry or supplier portal | About 10 seconds |
| Handles existing PDF and scanned POs | Yes, by hand | Only orders created in the suite | Any document, any layout |
| Captures part numbers and delivery dates | Error-prone by hand | Yes, once keyed in | Full line items, dates included |
| Works on supplier acknowledgment forms | Yes, slowly | Varies by module | Any vendor format |
| Setup and rollout time | None, but ongoing labor | Weeks to months | Minutes, no setup |
| Cost | High staff time per order | $300 to $2,000+ per month | Per document, scales with use |
PurchaseOrders automates the data-capture step so part data and delivery dates reach MRP faster. It does not run material requirements planning, manage inventory, or replace ERP and MRP software like NetSuite, SAP, Fishbowl, or Odoo; those stay where they are. Suite pricing reflects published ranges; check current figures before relying on them.
No new system, no manual re-keying.
Drag in the raw material, component, or equipment PO, PDF, scanned, or photographed, one at a time or a whole batch. Multi-page component lists are handled automatically.
Tip: Upload a real supplier PO or acknowledgment to see exactly which fields come back.
The AI reads the order and pulls the PO number, supplier, part numbers, quantities, units of measure, unit prices, delivery dates, and terms into a clean structured record you can review.
Tip: Check the captured delivery date against the PO before it flows into planning.
Download Excel or CSV for your planning sheet, or import the record into ERP or MRP software, so component quantities and dates are tracked without anyone retyping them.
A manufacturing purchase order is a document a manufacturer issues to a supplier that authorizes a specific purchase of raw materials, components, or equipment at agreed part numbers, quantities, and prices. It carries the promised delivery date the production schedule depends on, and once the supplier accepts it, the PO becomes a binding commitment to supply those parts on those terms.
Extract each purchase order into structured data, then map the part numbers and quantities to your item master and import them into your MRP or ERP. PurchaseOrders does the extraction step, turning the PO PDF or scan into a clean Excel or CSV record with part numbers, quantities, units of measure, and delivery dates, so the figures are ready to match and import.
A complete manufacturing PO includes the PO number, supplier, each part number and description, quantity with its unit of measure, unit price, the required delivery date, and any quality or specification requirements. These fields drive material requirements planning, so capturing every one of them accurately is what keeps order quantities and the build schedule correct.
Yes. The same extraction handles raw material POs, component and part orders, and equipment purchases, whether they arrive as a clean PDF, a scanned form, or a photo. The AI reads the supplier, part numbers, quantities, prices, and delivery dates from any layout, so every type of manufacturing order is captured the same way.
No. PurchaseOrders automates the data-capture step, turning PO documents into clean structured data. It does not run material requirements planning, manage inventory, or replace ERP and MRP software like NetSuite, SAP, Fishbowl, or Odoo. It feeds those systems faster by removing the manual re-keying of incoming purchase orders and acknowledgments.
The AI reads the part number, description, quantity, and unit of measure exactly as they appear on the line, so a sheet, an each, or a kilogram is captured as written rather than guessed. You review the structured output on screen against the source before import, which catches any supplier that labels a unit unusually before it reaches your item master.
Capture every component line for accurate MRP.
Clear a plant's worth of POs in one batch.
Roll component spend up across suppliers.
Get PO data into your MRP or ERP.